FACTOR · THE PERMIT RESOURCE CENTER
Yes, most home remodels in Denver need a permit. If your project changes the floor plan, touches a load-bearing wall, adds or resizes a door or window opening, reroutes ductwork, or adds or moves electrical or plumbing fixtures, the City and County of Denver requires one. Purely cosmetic work, such as paint, flooring and like-for-like cabinet replacement, generally does not.
Permits are issued by Denver Community Planning and Development (CPD) through the city’s online e-permits portal. This article covers Denver only. For Boulder rules, costs and the full process, see our Denver and Boulder Remodeling Permits Guide.
| FACTOR INSIGHT The mistake we see most often isn’t a homeowner skipping a permit on purpose — it’s assuming a project is cosmetic when it isn’t. If your remodel touches a wall, a pipe, or a wire, treat it as permit-required until you’ve confirmed otherwise. We map the full scope up front, so nobody’s project gets halted halfway through waiting on a permit that was never planned for. |
Denver’s Residential Interior Remodel guidance lists the triggers plainly. You need a permit when the project includes:
In practice, that covers nearly every kitchen, bathroom, basement and whole-home remodel that goes beyond finishes. Adding square footage instead? Here’s how permits work for a Denver home addition.

Finish-level work stays outside the permit system as long as nothing behind the wall changes:
Two cautions apply. First, exempt work still has to meet code. Second, the window and door exemption disappears if your home is a designated landmark or sits in a historic district, where exterior changes need city review.tors.
| Project | Permit in Denver? | What decides it |
|---|---|---|
| Kitchen refresh: new cabinets, counters and finishes, same layout | Usually no | Nothing moves behind the wall |
| Kitchen remodel that moves the sink or range, or adds circuits | Yes | Relocated plumbing, new electrical |
| Bathroom remodel that relocates a shower, tub or toilet | Yes | Relocated plumbing fixtures |
| Adding a bathroom | Yes | New plumbing, electrical and ventilation |
| Removing or moving a wall | Yes | Floor plan change, possibly structural |
| Basement finish | Yes | New walls, egress, electrical, plumbing, HVAC |
| New window, egress window or skylight | Yes | New or resized opening |
| Replacing windows in existing openings | No, unless landmark or historic district | Opening size is unchanged |
| Furnace, A/C or water heater replacement | Yes, a trade permit | Mechanical or plumbing work |
| Whole-home remodel | Yes | Layout, structure and systems all change |
The pattern is consistent. A project stops being cosmetic the moment it touches a wall, a pipe, a wire or a duct.

Usually more than one. A typical remodel carries:
If you upload everything needed for zoning, building and SUDP with the first application, Denver can review them at the same time.
Any project with exterior work on a designated landmark or in a Denver historic district needs a certificate of appropriateness from Landmark Preservation. The city strongly recommends getting it before you apply for building and zoning permits.
This catches homeowners in neighborhoods such as Potter Highlands, Baker and Curtis Park, where a window replacement that would be exempt elsewhere becomes a reviewed change. Our historic home renovation team plans for that review during design.
Sometimes. Denver lets owners of single-family homes apply for permits without a contractor if they meet the city’s eligibility criteria. A few limits matter:
Many owners pull the general construction permit and hire licensed subcontractors, who then pull their own trade permits.

Quick permits for trade work are issued without plan review. Projects that need plan review take longer, and the wait depends on scope and how complete the first submittal is. Denver publishes rolling 90-day average review times, which is the best current number to plan around.
We cover this in detail in How Long Does It Take to Get Remodeling Permits in Denver?
Unpermitted work tends to surface at the worst time: during a later permitted project, an inspection, or a sale. You may be required to open finished walls so the work can be inspected and brought up to current code. See Permit vs. No Permit: What Colorado Homeowners Need to Know for the full picture.
| FACTOR INSIGHT: The remodels that stall are rarely the ones where someone ignored permitting. They are the ones where a “cosmetic” kitchen quietly grew a relocated sink and two new circuits. At Factor, we map the full scope during design and time the permit so it is approved by the time the construction agreement is signed. Because the team that draws the plans also submits them and builds from them, reviewer comments are answered once. |
| FACTOR SERVICES Planning one of these? Explore Home Renovation, Kitchen Remodeling, and Bathroom Remodeling. |

Yes, if the remodel moves plumbing, adds or relocates electrical, reroutes ductwork or changes a wall. Replacing cabinets and countertops in the same layout generally does not.
Yes, when fixtures are added or relocated or new electrical is run. Cosmetic updates such as paint, tile and a like-for-like vanity generally do not.
Yes. Removing a wall alters the floor plan, and if the wall is load-bearing the permit will also need structural details for the new beam.
The contractor usually does. In a design-build project, one firm prepares the drawings, submits them, responds to plan review and builds the work.