Featured in City Lifestyle: Factor Design Build’s Modern Edge on Colorado Living
Modern Edge: Factor Design Build Featured in City Lifestyle We’re proud to share that Factor Design Build was recently featured …Read more

FACTOR · THE PERMIT RESOURCE CENTER
Yes. Every home addition in Denver needs permits, whatever its size. The City and County of Denver requires three construction permits for an addition: a zoning permit, a building permit, and a sewer use and drainage permit (SUDP). Electrical, plumbing and mechanical work each need a trade permit on top of those.
Additions get the fullest review of any residential project because they change the building’s footprint or height. This article walks through the Denver permit stack for additions. For Boulder rules and the wider process, see our Denver and Boulder Remodeling Permits Guide.
| Permit | What it reviews | When you apply |
| Zoning permit | Size and location of the structure on your lot: setbacks, height, bulk plane, building coverage | With the first application |
| Building permit | Structure, energy code, egress and life safety | With the first application |
| Sewer use and drainage permit (SUDP) | Sanitary sewer, storm drainage and water connections | With the first application |
| Trade permits | Electrical, plumbing, mechanical, roofing and siding | After the Residential Construction Permit is issued |
| Other permits, as needed | Demolition, excavation or shoring, right-of-way, tree removal | Separate applications |
Two details from Denver’s New Homes and Additions guidance are worth knowing early:

| FROM THE FACTOR TEAM On additions we treat zoning as the first gate, not an afterthought. Confirming setbacks, lot coverage, and height for your exact parcel before the design is locked prevents the most expensive kind of rework — a beautiful plan the code simply won’t allow. We figure out the buildable envelope first, then design a home inside it. |
The answer is always yes. What changes is which reviews carry the most weight.
Decks, porches and patio covers. These follow a separate Denver permit guide and are not treated as additions unless they become enclosed living space.
Ground-level additions. A rear or side addition expands the footprint, so setbacks, building coverage and the SUDP review matter most. Foundation and excavation details are part of the submittal.
Pop-tops and second-story additions. The footprint stays the same, so Denver places its pop-top guidance with interior remodels. A pop-top still needs building and zoning review, and the existing structure has to be shown to carry the new second story.
Accessory dwelling units. A detached or attached ADU is a separate dwelling with its own zoning standards and needs its own address before permit submittal.
The Denver Zoning Code regulates the size and location of structures on your lot. For an addition, that sets the envelope you can build in: how close to each lot line, how tall, and how much of the lot can be covered.
A design that ignores those limits will not get a permit, however good the floor plan is. At Factor, we treat zoning as the first gate. We confirm setbacks, coverage and height for the specific lot before the design is finalized, then design inside that envelope. It prevents the most expensive kind of rework: a plan the homeowner loves and the code will not allow.

Denver’s guidance flags several situations that add a review or a requirement. Check each one against your address before design begins.
Denver’s Residential Permitting Guide sets out what to upload. An addition is checked under five reviews: residential, structural, energy, zoning, and zone lot verification. Expect to provide:
You apply online through e-permits by selecting “building log,” then Single Family/Duplex Residential and the Addition project scope.
Plan for months, not weeks. Additions sit at the complex end of Denver’s review paths, and most go through at least one round of reviewer comments.
Two city resources help set expectations. Denver publishes rolling 90-day average review times. And under Executive Order 151, effective May 14, 2025, the city committed to a maximum of 180 calendar days of city review time per development application. That clock counts only the days plans are with city staff, not the days they are back with the applicant for corrections.
The variable you control is the quality of the first submittal. We cover timing in depth in How Long Does It Take to Get Remodeling Permits in Denver?
Denver allows eligible single-family homeowners to pull their own permits, but an addition involves architectural drawings, structural engineering, zoning analysis and several coordinated reviews. With a traditional architect-plus-contractor setup, that coordination often lands partly on the homeowner.
In a design-build project, one team designs the addition, submits it, answers reviewer comments and builds it. See Design-Build vs. General Contractor: Who Handles Permits? for a closer comparison.

An addition is the most permit-intensive project a homeowner takes on, and the easiest one to get right when zoning, structure and site constraints are settled during design. Read the full Denver and Boulder Remodeling Permits Guide, or if you are reworking existing space instead, see Do You Need a Permit for a Home Remodel in Denver?
To talk through what your lot allows, explore our home addition services or contact the Factor team.
| FROM THE FACTOR TEAM Information reviewed October 2026. Permit rules change and depend on your address and scope. Confirm current requirements with Denver Community Planning and Development before starting work. |
| FACTOR SERVICES Thinking about adding on? Explore Home Additions — and for whole-home scope, Home Renovation. |

No. Any attached addition that adds enclosed space needs zoning and building permits, regardless of square footage.
Yes. A pop-top needs building and zoning review even though the footprint does not change, along with trade permits for the new electrical, plumbing and mechanical work.
After the Residential Construction Permit is issued. Denver has required this for additions since May 22, 2025.
Yes. You need a certificate of appropriateness from Landmark Preservation, ideally before you apply for building and zoning permits.














Ready to invest in your home and yourself? Let’s discuss your next luxury design-build project.
CONTACT US© 2026 Factor Design Build. All rights reserved. Privacy Policy Espy Solutions Web Design